{"id":11427,"date":"2021-08-06T09:43:48","date_gmt":"2021-08-06T08:43:48","guid":{"rendered":"https:\/\/active8robots.com\/?page_id=11427"},"modified":"2023-07-21T13:49:06","modified_gmt":"2023-07-21T12:49:06","slug":"the-pipe-project","status":"publish","type":"page","link":"https:\/\/active8robots.com\/case-studies\/the-pipe-project\/","title":{"rendered":"\u201cThe Pipe Project\u201d"},"content":{"rendered":"\t\t
Client: MTC \/ BAE Systems.<\/strong><\/p>\n <\/strong><\/p>\n Sector: <\/strong>Aerospace, defence & maritime.<\/p>\n Application: <\/strong>Precision pipe fixturing.<\/p>\n Problem: <\/strong>Difficulties in manually measuring and assembling pipe flanges at awkward angles in confined spaces.<\/p>\n Solution: <\/strong>Automated hybrid collaborative and industrial robot cell engineered to accurately measure and manoeuvre pipe flanges for a series of pipework formations prior to manual welding process.<\/p>\n <\/p>\n Technologies:<\/strong><\/p>\n
<\/p>\n\n